DCIM100MEDIADJI_0021.JPG

Operation: Renovation

Br. Maximilian provides us with today’s pictures from inside the monastery. The renovation process proceeds as workers continue the demolition process.

Below:  One of the stairways is removed, leaving quite the drop-off below.
DSCN2123 DSCN2076 DSCN2078 DSCN2088
Above: The monastery’s “treasures” are stored away from harm’s way.
DSCN2089 DSCN2091