July 7, 2015
Pave the Way
Workers were focusing their efforts on the south side of the monastery Monday morning and afternoon, where they are putting in a concrete patio area and continuing to finish the sidewalks around campus. Their work, however, was abruptly suspended due to an impressive rainfall that lasted most of the afternoon and into the evening.
Below: Monks enjoy a nice evening and check out the area before the concrete is poured.
Posted in Daily Life, Listen, My Son